EAA Chapter 898

Ocean County, NJ

Thatcher CX4 October 26 2022 Build

  • EAA
    Aileron structure
  • EAA
    Bill cutting angle iron to be used to support the fuselage
  • EAA
    Bill filing the fuselage support
  • EAA
    Bill measuring the bulkhead where the fuselage support will be inseerted
  • EAA
    Bill cuts the bulkhead for the fuselage support
  • EAA
    Closeup of cutting a bulkhead for a fuselage support
  • EAA
    Bill secures a support into the bulkhead
  • EAA
    Drilling a rivet hole in a fuselage support
  • EAA
    Bob F files a control rod joiner
  • EAA
    Bob F working on a control part
  • EAA
    Mike and Bob N measure sheet metal squares
  • EAA
    Bob N looks on as Mike drills sheet metal squares
  • EAA
    Bob N cutting sheet metal squares
  • EAA
    Charlie and Bob F review the plans
  • EAA
    Control system in process of being assembled
  • EAA
    Kurt bending a piece of sheet metal
  • EAA
    Rudder and stabilizer waiting to be installed
  • EAA
    The left over after drilling sheet metal
To provide a better user experience, EAA uses cookies. To review EAA's data privacy policy or adjust your privacy settings please visit: Data and Privacy Policy.
loading

Loading...