EAA Chapter 898

Ocean County, NJ

Thatcher CX4 August 24 2022 Build

  • EAA
    Bob N and Steve discuss the bulkhead installation
  • EAA
    Charlie and Gene take bulkhead measurements
  • EAA
    Charlie measures the bulkhead
  • EAA
    Charlie works on a detail of the control system plans
  • EAA
    Christine and Chris Barra Guerra show the group model paper airplanes they made
  • EAA
    Chris and Christines paper models
  • EAA
    Chris Guerra shows us a model paper airplane he made
  • EAA
    Chris Guerras paper airplane models
  • EAA
    Christine Guerra shows us some of the paper models she has made
  • EAA
    Chrstines and Chris paper models
  • EAA
    Steve is drilling out a bulkhead
  • EAA
    Installing a long eron
  • EAA
    Jim drills out rivet holes while Walter sets rivets
  • EAA
    Jim enlarges rivet holes while Walter sets rivets
  • EAA
    Jim looks on while Walter removes clecos in preparation for riveting
  • EAA
    Jim removes the clecos while Walter places the rivets
  • EAA
    Marking a bulkhead for drilling
  • EAA
    Placing clecos on the rudder
  • EAA
    Riveting the stabilizer
  • EAA
    Walter riveting the rudder
  • EAA
    Wayne and Lenny smoothing a jig
To provide a better user experience, EAA uses cookies. To review EAA's data privacy policy or adjust your privacy settings please visit: Data and Privacy Policy.
loading

Loading...