EAA Chapter 898

Ocean County, NJ

Thatcher CX4 August 3 2022 Build

  • EAA
    Bill and Bob N place a bulkhead into the fuselage
  • EAA
    Bill and Doug working on the bulkhead
  • EAA
    Bill Martin cutting the bulkhead for the long eron
  • EAA
    Bill Martin filing a bulkhead eron cutout
  • EAA
    Bob F checking the drawing for the control stick layout while Matt flutes a bulkhead
  • EAA
    Bob F makes a jig for the control stick
  • EAA
    Bob F measures the control stick
  • EAA
    Bob Fairbanks making a fixture for welding the control stick
  • EAA
    Bob Fairbanks making a jig to hold the control stick
  • EAA
    Bob Fairbanks Matt Langbein and Kurt Stofko discussing fluting a bulkhead
  • EAA
    Bob Newman fitting a new bulkhead into the fuselage
  • EAA
    Bob Newman looks on while Bill Matin moves a long eron
  • EAA
    Charlie Conley checks the demensions of the fuselage while Bill makes a cutout for the long eron
  • EAA
    Cutting a bulkhead to attach a long eron
  • EAA
    Doug McQueen working on a bulkhead
  • EAA
    Doug working on the long eron layout
  • EAA
    Fluted bulkhead on a jig
  • EAA
    Matt Langbein fluting a bulkhead
  • EAA
    Matt looking at a fluted bulkhead
  • EAA
    Measuring the bulkhead structure
  • EAA
    Wayne works on drilling a rudder piece while Kurt and Debbie look on as Matt flutes a blukhead
  • EAA
    Working on an eron
To provide a better user experience, EAA uses cookies. To review EAA's data privacy policy or adjust your privacy settings please visit: Data and Privacy Policy.
loading

Loading...