Thatcher CX4 February 1 2023 Build

  • EAA
    Making the plan for the night
  • EAA
    2 Bob F cuts an engine support beam
  • EAA
    3 Plans for converting to a tri gear
  • EAA
    4 Charlie and Bob F discuss the front strut placement
  • EAA
    5 Charlie and Bob continue discussing the front strut placement
  • EAA
    6 Doug and Bob F review the front strut placement
  • EAA
    7 Doug and Bob F position the front strut against the firewall
  • EAA
    8 Doug measures to cut a hole in the jig for the front strut
  • EAA
    9 Doug drills a pilot hole for the jig saw
  • EAA
    10 Doug cuts a hole in the jig for the front strut
  • EAA
    11 Walter and Doug look at a control rod
  • EAA
    12 Walter and Rich discuss placement of a control rod bushing
  • EAA
    13 Walter drills a bolt hole for a control rod bushing
  • EAA
    14 Drilling a hole to secure a control rod bushing
  • EAA
    15 Installing a control rod bushing
  • EAA
    16 Walter and Rich mark the placement of another control rod bushing
  • EAA
    17 Walter prepares to use a right angle drill for the installation of a control rod bushing
  • EAA
    18 Horizontal stabilizer installation directions
  • EAA
    19 Walter and Charlie discuss the horizontal stabilizer
  • EAA
    20 Walter reviewing the horizontal stabilizer plans
  • EAA
    21 Walter and Kurt compare horizontal stabilizer parts against the plans
  • EAA
    22 Walter and Kurt work on the horizontal stabilizer
  • EAA
    23 Kurt removes a cleco so Walter can expand a rivet hole
  • EAA
    24 Debbie removes plastic from RV 10 supports
  • EAA
    25 Mike polishes RV 10 while Walter works on the Thatcher horizontal stabilizer