Bloomington/Normal, IL. KBMI - Hangar F-15

Hazen Build

  • EAA
    Finally warm enough for the glue to dry. Table built and 1st spar framed out.
  • EAA
    Installing aluminum lining for aileron.
  • EAA
    Working on these parts over winter and quarantine time.
  • EAA
    Getting ready to install diagonal and compression ribs.
  • EAA
    Getting this area ready to finish built aileron.
  • EAA
    Small pieces varnished, hanging to dry.
  • EAA
    Varnish box for ribs. Lining up ribs and spars to assemble.
  • EAA
    Partition in varnishing trough to do small pieces.
  • EAA
    Wing one 90% done.
  • EAA
    Wing two 70% done. Good weather for building.
  • EAA
    Part of aileron masked and ready to varnish.