EAA Chapter 524

FREDERICK, MD

RV 10-32

July 4, 2020 - RV-10 Build Team is continuing to meet on  Thursdays (6-9pm) and Saturdays (9am-noon). The photos were taken on July 4th and July 11th. As you can see, great progress is being made.

 

Progress on the air conditioning system is significant; a majority of the fuel system plumbing is installed; doors are assembled; wings are complete and waiting. Work on a wheel and break assembly have been completed, soon to be disassembled, deburred and double checked for maximum efficiency. Work continues on the body.